ITU WP 4A Workshop on non-GSO satellite issues was held on April 21, 2016 in Geneva, Switzerland.
The Director of the Radiocommunication Bureau in his report to WRC-15 drew the attention of the Conference to the increasing number of requests for coordination submitted for non-GSO satellite systems operating in the FSS subject to the equivalent power flux-density limits in Article 22 and to coordination under No. 9.7B of the Radio Regulations.
The report highlighted certain issues associated with this situation and, as such, WRC-15 was invited to:
- further consider reviewing means by which the coordination of non-GSO satellite systems with each other or with GSO networks in specific frequency bands may be facilitated including the pertinence of the existing sharing criteria to the non-GSO FSS systems containing very large number of satellites and a wide diversity of orbital characteristics,
- the possible flexibility to modify specific parameters or orbital characteristics of the non-GSO satellite systems during the coordination process without impacting the date of receipt of the relevant coordination requests and the definition of bringing into use of frequency assignments for non-GSO systems.
The purpose of the workshop is to share views on these issues focusing on technical and practical considerations which would assist both the Bureau to process the non-GSO FSS filings so far received in a clear and transparent manner and the ITU-R membership to develop relevant recommendations and/or reports as well as studies under related WRC-19 agenda items within Working Party 4A
Source: ITU
The meeting of the Board of the Ministry of Communications and Informatization
To the attention of certificate holders, applicants for the certification and those, who accept declarations
Preparation and testing at EMC Laboratory
Changes in the Rules for the telecommunication services provision